Seamless Rubber Flooring
SBR Seamless Rubber Application
Seamless SBR rubber flooring is passed to the implementation phase after the concrete floor is cleaned properly and smoothly. A layer of primer is applied to the cleaned surface. This application makes binding effect between the ground floor and materials and connects them to each other tightly.
After drying of the primer application, polyurethane BINDER is mixed with the help of mixer with SBR Rubber granules by suitable ratio. By adding appropriate amount of colorant dye the mixture becomes the desired color and fluid. The mixture is spread over the dried primer application at the desired thickness.
The applications is completed after drawing the lines of the sport area on SBR Rubber Granule which is layered at desired thickness.